Gujarat top-up on PM Surya Ghar for home systems up to 2.18 kW, so the household pays about 10% of the benchmark cost.
Subsidy Type
tiered
Capacity Range
1.00 – 2.18 kW
Implementing Agency
Gujarat Energy Development Agency (GEDA)
Gujarat adds a state top-up to the central PM Surya Ghar subsidy for small home systems. These terms come from press reports of a Gujarat government resolution dated 22 October 2026. Check with your electricity company before you order. As reported: - Only for systems up to 2.18 kWp, commissioned on or after 22 October 2026 - The household pays about 10% of the benchmark cost (about 5% for SC/ST households) - Benchmark cost: ₹50,000 per kW for the first 2 kW and ₹45,000 per kW beyond - The state covers the gap after the central subsidy: about ₹15,000 for 1 kW, ₹30,000 for 2 kW and ₹34,050 for 2.18 kW - Capacity cannot be added for 3 years Larger systems get the central subsidy only, up to ₹78,000.
Get started with your solar installation today. Connect with our empanelled EPC contractors who can guide you through the entire process and help you avail maximum benefits under this scheme.
Consumer Types
residential
Step 1: Register on the national portal (pmsuryaghar.gov.in) Step 2: DISCOM approval (UGVCL/DGVCL/MGVCL/PGVCL) Step 3: Empaneled vendor selection Step 4: Installation and inspection Step 5: Net meter installation Step 6: Central subsidy disbursement Step 7: State subsidy processing
Launch Date
22 October 2026