PM Surya Ghar rooftop solar subsidy in Lakshadweep — up to ₹85,800 central assistance plus a Lakshadweep state top-up, net-metering readiness, and estimated savings for your home.
Lakshadweep receives an estimated 1,400 kWh per kW per year of solar irradiance — one of India's moderate solar regions. A 3 kW rooftop system covers roughly 4200 kWh/year — enough for a typical urban household.
₹1,80,000
Max subsidy (3 kW)
1,400
kWh / kW / year (est.)
0/—
Net-metering DISCOMs
0
Listed installers
Under the PM Surya Ghar: Muft Bijli Yojana, residential rooftop solar in Lakshadweep receives Central Financial Assistance of ₹33,000 per kW up to 2 kW, an additional ₹19,800 per kW for the 2–3 kW slab, capped at ₹85,800 for systems of 3 kW and above (higher special-category rate). The subsidy is credited directly to your bank account after installation and inspection.
Lakshadweep state top-up (Lakshadweep Administration): ₹45,000/kW for the first 2 kW, ₹27,000 for the 3rd. Paid on top of the central subsidy. Source: MNRE Annual Report 2025-26, state top-up list, checked Nov 2026. Confirm with Lakshadweep Administration before you rely on it.
| System | Subsidy | Net cost* | Annual units | Annual savings | Payback |
|---|---|---|---|---|---|
| 1 kW | ₹60,000 | ₹0 | 1,400 | ₹9,800 | 0 yrs |
| 2 kW | ₹1.20 L | ₹0 | 2,800 | ₹19,600 | 0 yrs |
| 3 kW | ₹1.80 L | ₹0 | 4,200 | ₹29,400 | 0 yrs |
| 5 kW | ₹2.03 L | ₹97,200 | 7,000 | ₹49,000 | 2 yrs |
*Indicative: ₹60,000/kW turnkey cost, ₹7/kWh tariff, and Lakshadweep's estimated 1,400 kWh/kW/year yield. Actual figures vary by vendor, roof, and DISCOM tariff. Use a precise calculator →
DISCOM data for Lakshadweep is being expanded — see the full DISCOM directory.
View all DISCOM net-metering policiesResidential rooftop systems in Lakshadweep qualify for the PM Surya Ghar Central Financial Assistance: ₹33,000/kW up to 2 kW and ₹19,800 for the 3rd kW (special-category rate), capped at ₹85,800 for systems of 3 kW and above. Lakshadweep adds a state top-up: ₹45,000/kW for the first 2 kW, ₹27,000 for the 3rd.
At an indicative turnkey cost of ₹60,000/kW, a 3 kW system is about ₹1,80,000 gross. After ₹1,80,000 of subsidy, the net cost is roughly ₹0, generating an estimated 4,200 kWh/year in Lakshadweep — a payback of about 0 years.
Net metering in Lakshadweep is administered by your local DISCOM. Check your DISCOM's net-metering status on the SolarPanti DISCOM directory.
Based on Lakshadweep's solar resource, 1 kW of rooftop solar generates an estimated 1,400 kWh per year (about 9,800 rupees of avoided electricity cost annually). Actual output depends on roof orientation, shading, and system quality.
Register on the national PM Surya Ghar portal, apply through your Lakshadweep DISCOM, get a registered vendor to install an approved system, request net metering and inspection, then submit your details and bank account — the subsidy is credited directly. SolarPanti guides you through each step.